Work scope: Flange Management, Leakage Test, Nitrogen Filling/Drying

Timeast joined the project on January 18, 2016 and the project was delivered on June 16, 2016.

The work scope includes Module 715-1 process master, Module 715-2, and Module 715-3

Timeast commence the following jobs: Flange Management, Leak test and Nitrogen Service

     2,946 joints completed for Flange Management.

     Leak test was performed on 38 packages, pipeline length 9832 meters, MOP test was performed on 9 packages, pipeline length was 4229 meters. The total length of the test pipeline is 14061 meters.